We are your forum for practical exchange and networking on Bavarian deep geothermal energy.
Together with representatives from operations, industry, business, politics and science, we discuss the latest issues relating to the optimal implementation of geothermal projects every year. From technical challenges and innovations such as AI to the open exchange of experiences from project development and operation, the Praxisforum offers the ideal platform.
You too can become part of our Bavarian “geothermal class meeting” - whether as a participant, speaker, exhibitor or sponsor.
If there are enough registrations, the congress will be simultaneously translated.
Program
The Career Forum is our event for students. In addition to a series of short presentations, we invite participants to network with our sponsors and exhibitors, as well as join an excursion to the geothermal plant operated by IEP in Pullach. We’ll wrap up the day with a shared drink at IsarBräu.
The Career Forum is supported by Innovative Energie für Pullach (IEP).
Moderation
MALEG – Machine Learning in Aquatic Geochemistry
Machine Learning–Enhanced 3D Seismic Interpretation of Rhaetian Channel–Floodplain Geomorphology for Geothermal Exploration in the North German Basin
Welcome Address
Welcome Address
Cuttings Disposal 2.0
Risk management for deep geothermal energy: Cost and quality effects through professionally qualified monitoring
Moderation
Moderation
Medium-Depth Geothermal Resources in the Molasse Basin: A Geological, Techno-Economic and Environmental Study on the Integration of Large-Scale Heat Pumps
Development of Medium-Depth Geothermal Projects in Bavaria
Medium-Depth Geothermal Energy and Heat Pumps: Current Status of the Arhus Project
Moderation
Deep Geothermal Energy for Decarbonizing the City of Vienna
More 'Energy Beneath Our Feet' – We're Drilling Again!
GEMO, Current Status of the Intermunicipal Project
Moderation
tba
This year, the GeoTHOUR first takes us to MTU in Munich-Allach, where two successful drillings were completed in 2024. A heat distribution center is currently under construction there. Afterwards, we’ll visit the Laufzorn II drilling site, where the first well is currently being drilled.
Silber sponsors

AZ Armaturen GmbH

NW Assekuranz
Tickets
October 22, 2025
- Coffee Breaks
- Access to Presentation Download
- Available until October 14, 2025
October 23, 2025
- 2 Coffee Breaks and Lunch
- Access to Presentation Download
- IceBreaker (22.10.2025)
- Available until October 14, 2025
October 24, 2025
- Visiting geothermal project sites
- 09:00 am - 16:00 pm
- departure/arrival at central busstation (ZOB)
- catering
- Available until October 14, 2025
cooperation partner
News




